top of page
Reconstruction Project of a Public School
This project involved the reconstruction of the historical building of Secondary School No. 414 in St. Petersburg, incorporating numerous missing halls and facilities into the layouts. It was decided to dismantle the existing old gymnasium and replace it with a new two-story building featuring a gymnasium measuring 30x18 m, a swimming pool with a basin of 25x11 m, a library, a cafeteria, a medical office, facilities for the senior school, and administrative spaces. Unfortunately, the facade of the new building was approved, which did not align with our original design concept. Nevertheless, the school was completed in accordance with the initial vision.
Total Area: 9,826 m²
Year of Completion: 2015
bottom of page